Gavin Construction - Lord Street

Projects

You are here: Home > Projects > Commercial > Lord Street

Lord Street

 
Project Overview
     
Two Office
Due for completion in May 2009:-
Lot 828 is 6,000m² over four levels
Lot 829 is 7,000m² over four levels 
  
                          
                              
  • Location: Corner Newcastle Street, Lord Street and Parry Street
  • Contract source: Tender


Project Features

Prominent design feature: The two office buildings have the benefit of being located on two prominent corners in the East Perth office precinct. The architect (Palassis Architects) has utilized these facades by providing detailed and ornate treatments of structural steel and alucabond cladding that will make this a land mark building in the area.

There are also some architectural precast panels featuring recessed panels with exposed aggregate on Lot 828.

Construction features: Lot 828 is a traditional insitu concrete structure. Lot 829 is a special lightweight steel framed structure on all levels with Fielders Kingflor permanent steel formwork. Lot 829 is actually located over the Northbridge Tunnel, hence the special lightweight design.

Internal features: The ground (street) level is a combination of retail spaces with carpark. The first floor is a combination of office space and upper level car parking. The two uppermost floors are entirely office space. All office spaces are fitted out with ceilings, carpet and a chilled beam air conditioning system.

Image Gallery
Latest News:
Shire of Roebourne Comments : Gavin Construction "Doing it Right" in Baynton West, Karratha.

Click Here to view Article

Website by: Equilibrium
MBA Excellence in Construction Overall Winner.
View our SiteCam installed at selected sites.